Reeves Young provided construction management services for the development of a 450,000 SF building, including tenant improvements for Southeast Toyota’s distribution facility, completed in two phases. The project also includes 33,000 SF of Class A office space, featuring private offices, conference rooms, a health and wellness area, and a cafeteria. This portion required significant demolition and deep foundation work, with the office space finished to a Level 5 standard, incorporating custom wall coverings and lighting packages. Additionally, the office area includes an amenity patio.
Extensive upgrades were made to the warehouse, which is fully air-conditioned with 22 RTUs, 21 HVLS fans, and 60 aisle racking fans, maintaining a constant temperature of 72 degrees throughout the facility. The warehouse is equipped with an ASRS system, requiring over 215 piles and a high-performance slab for the Auto Store installation. The scope also included overseeing the installation of conveyors and warehouse racking. The building features high-bay LED lighting, a Building Management System, and a VESDA fire alarm system.
Located on 26 acres in Greenville, SC, this 6,00 SF maintenance operations and administration facility serves Greenville Transit Authority’s Greenlink Bus System. The 40,000 SF bus maintenance area features a fleet service area with two fueling and fluid management lanes, fare collection, eight service bays, and a fully automated bus wash. The facility also houses parts, tires, and tool storage, along with locker rooms, showers, training space, and laundry services. A second 18,000 SF administration building accommodates employee offices, Transit Authority Board and Community Room, driver-ready lounge, dispatch, and conference space. The site also includes infrastructure for diesel, electric, and future compressed natural gas buses. There is also parking for approximately 200 employees and 88 bus parking spaces to accommodate future fleet growth. Site improvements were also included in order to create a green space/park environment with a walking trail and community pavilion.
Reeves Young was selected for this tenant build-out comprised of 3,952 SF of office space and 46,294 SF of warehouse space. The scope included an open office area entrance (lobby), a 400 SF conference room, eight employee offices, a breakroom, and restrooms. The warehouse space also included adding additional unit heaters (2), with an extension of the gas line to these unit heaters. Due to significant power load capacity, the buildout also required a separate electrical room space and a whole new main transformer installed directly outside of the space.