Menu Commercial Water Resources Heavy Civil Industrial

River Park Force Main

Reeves Young was responsible for all site clearing and erosion control on this project, as well as installation of approximately 5,000 LF of 24″ ductile iron pipe with high density polyethylene Force Main, and the repair of 400 vertical feet of existing sanitary sewer manholes.

Riverbend Environmental Complex

This new, 0.5 MGD Wastewater Treatment Plant on a 20.2 acre property consisted of screening, sequencing batch reactors, clarification, filtration, UV disinfection, post aeration, sludge holding, thickening and dewatering, plant drain pump station, chemical feed systems, a building rehabilitation, and electrical power distribution including standby generator, new SCADA system and two new lift stations. The Airport No. 1 Lift Station and Force Main consisted of replacement of pumps, starters and other equipment at the existing pump station and installation of 17,000 LF of a 12″ high density polyethylene pipe. Smithwick Creek Lift Station and Force Main consists of new submersible wastewater pump station and installation of approximately 15,000 LF of a 10″ high density polyethylene pipe, 2,300 LF of 24″ ductile iron pipe sanitary sewer and 1,300 LF of 8″ PVC sanitary sewer.

Rockbridge Road

This project involved providing design and construction services to Dekalb County for the replacement of 40,000 LF of 8” asbestos cement water main lines with new ductile iron pipe.