Menu Commercial Water Resources Heavy Civil Industrial

Hilton Curio Charlotte

Reeves Young served as the Program Manager for the Hilton Curio in downtown Charlotte, North Carolina. Creating a new live/work/play environment for Charlotte, this 11-story hotel shares the city block of 7th and Tryon along with a library, innovation center, new residential towers, and theaters. This new 178,000 SF hotel will provide 220 guest rooms and a new restaurant. As Program Manager, Reeves Young is managing the design process, general contractor selection, and is working with the master developer to break ground in 2023.

Hyatt Regency Houston

Located next to the Houston Galleria in Uptown Houston, Hyatt Regency Houston/Galleria is steps from the city’s most fashionable shopping, dining, and entertainment. Reeves Young served as program manager and also self performed the excavation and utility installation work for two Hyatt hotels. The 325-room hotel on Sage and West Alabama roads features 20 suites, 15,000 square feet of meeting space, restaurants and a fitness center that overlooks the pool. It is the ninth Hyatt-branded hotel in the Houston area. The new hotels are part of the 7.6-acre Galleria Plaza mixed-use development that includes office and retails space, fronting Westheimer Road and directly across Sage from the Galleria mall.

Hyatt House Nashville

Located within Nashville’s Midtown district, this 15-story 200-room Hyatt House Hotel replaced the vacant 29,980 SF 21st Plaza office building. The prime 0.62-acre property was chosen by the developer due to its proximity to downtown Nashville, Vanderbilt University, and hospitals in Nashville’s medical corridor. Reeves Young performed all foundation and concrete structure, building skin, roof, and building envelope work. Designed by Wakefield Beasley to embrace the sound of “Music City”, Reeves Young utilized SWS panelized EIFS system to provide seven varying shades of white and gray in an “equalizer” fashion of color change. The prefabricated EIFS panels allow our construction team to dry in the building literally 12 days after topping out the post-tension concrete structure.