Project Tipin

Reeves Young performed turnkey sitework and utility installation services for two single story data centers located on 94 acres. The project scope included installation of all water and sewer infrastructure as well as footing and foundation excavations for the project.

Flexential Data Center

Reeves Young performed turnkey site package work for Brasfield & Gorrie on a data center expansion. Our sitework scope included excavation, water, sewer, and storm drainage. The storm drainage included 4,000 LF of pipe from 8” to 24” in size.

Databank ATL 4 

Reeves Young performed turnkey site package work for Brasfield & Gorrie on an 18-acre site to make way for a 173,000 SF data center. The sitework scope included blasting, excavation, water, sewer, and storm drainage. The storm drainage included over 1,000 linear feet of 72″ diameter corrugated metal pipe. There is also approximately 20,000 CY of mass rock to blast.