Rockbridge Road Water Main Replacement

Project Description

Project: VD Parrott Water Treatment Chemical System Improvement
Location:  Dalton, Georgia

Multiple improvements for Dalton Utilities including:
Construction of a new Coagulant Building including a bulk storage and feed system and storage area for dry palletized chemicals. Conversion of existing filter to a post chemical building including orthophosphate feed and bulk storage, fluoride feed and bulk storage and a caustic feed and bulk storage. Modifications to existing Raw Water Chemical Building to convert existing potassium permanganate to liquid sodium permanganate system. Sitework including construction of two new chemical unloading stations, expansion of existing chemical unloading station and a new loading dock area. Demolition of existing coagulant tank and feed pumps, lime slurry storage and feed system, fluoride feed pumps and day tanks.