Menu Commercial Water Resources Heavy Civil Industrial

Project Starbelt

This project for Holder Construction involves the installation of a full sanitary sewer system on a 300-acre site which will become a Facebook data center. The heavy civil scope consists of over 10,000 SF of pipe installation: 2,621 LF of 6” PVC pipe, 4,469 LF of 8” ductile iron pipe, and 4,672 LF of 12” ductile iron pipe.

Project Morning Hornet

Reeves Young is responsible for self-performing 100% of the utility infrastructure work for Holder Construction on these 195 undisturbed acres which will become a 900,000 SF Facebook data center project. This installation includes 8″ sewer and 8″–12″ water utility infrastructure piping, including manholes. Over 30,000 LF of pipe is being installed, including 11,367 LF of 8” SDR 35 sanitary sewer piping, 11,892 LF of 12” ductile iron pipe for a fire line, and 13,364 LF of 8” ductile iron pipe for a domestic water line.

Upper Proctor Creek Phase B&C

Reeves Young completed the phased delivery of this project, which encompassed demolition, new capacity relief storage facility, sanitary sewer, earthwork, hardscapes, and re-routing stormwater piping. The project separated the combined sewer/storm system to re-route stormwater piping. The scope of work included demolition, storm, water, sanitary, earthworks, & hardscapes.