Riverbend Environmental Complex

Location: Ball Ground, GA
Size: .5 MGD/20.2 acres

New 0.5 MGD Wastewater Treatment Plant consisting of screening, sequencing batch reactors, clarification, filtration, UV disinfection, post aeration, sludge holding, thickening and dewatering, plant drain pump station, chemical feed systems, building rehabilitation, electrical power distribution, including standby generator, new SCADA system and two new lift stations.

Airport No. 1 Lift Station and Force Main consists of replacement of pumps, starters and other equipment at the existing pump station and installation of 17000 LF of 12″ HDPE Force Main.

Smithwick Creek Lift Station and Force Main consists of new submersible wastewater pump station and installation of approximately 15,000 LF of 10″ HDPE Force Main, 2,300 LF of 24″ DIP sanitary sewer and 1,300 LF of 8″ PVC Sanitary sewer.