Project Description

Project: Johnson Creek Pump Station
Location: Lithonia, GA
Size: 3MGD/ .78 acre

Design-Build construction of a new 3 MGD Sewage Pump Station.  The project is fast track and required due to a consent order from EPD.  The project includes approximately 5,000 CY of cast in place concrete, rock excavation, and 48″ Gravity Sewer.  Equipment to be installed includes submersible pumps, slide gates, odor control system and a 5-ton Bridge Crane.